New Hydration Water Filling Station

March 2, 2023

Larry's Plumbing recently installed a hydration water filling station for one of our clients.


Hydration is essential for good health. Introducing Elkay's EZH2OTM bottle filling station
 
Ideal for education, healthcare facilities, fitness clubs, and hospitality


EZH2O bottle filling station provides convenient hydration, reduces our dependency on plastic water bottles, provides a rapid fill water to quench thirst and help minimize disposable plastic bottle waste in the environment.


QUICK, CLEAN + GREEN

–The EZH2O bottle filling station fill rate* is 1.1-1.5 gpm; 3 times faster than a traditional drinking fountain
–One-handed operation allows for a quick fill between activities
–The electronic sensor provides touchless, sanitary operation; just place and fill
–Available as Filterless or with the WaterSentry® Plus 3000 gallon filter is included (NSF 42 & 53 certified for particulate, chlorine, taste & odor and lead reduction)
–Integrated Silver Agion Anti-microbial protects against mold and mildew growth
–Innovative Green TickerTM counts the quantity of bottles saved from land fills


* Fill rate is 1.1 gpm for refrigerated units and 1.5 gpm for non-refrigerated units

August 26, 2026
Returned to the job site to televise the roof drain from inside the building to the outside manhole. Utilized a lift to cut out the existing leaking 6" roof drain connection and multiple fittings. Removed debris and prepared the area. Re-piped the main 6" PVC and fittings, installed a cleanout, and secured the pipe vertically with support hangers and bracing. Tested the system and cleaned the work area. It's now ready for use.  Hydro jetted from the cleanout of the roof drain towards the side of the building's manhole. Flushed the fixture and conducted tests, which passed. It is ready for use.
August 21, 2026
8/18/26 After sawcut and concreted removal, excavated down to new 6" SDR on outside and to old 4" cast iron on inside area 5' deep. Broke out old CI and tunneled under foundation. Stubbed new 6" grease line into building with wye and cleanout. Bedded in stone. Removed concrete and hauled away spoil.  8/19/26 Returned after inspection to backfill in stone over bottom of footing and haul spoil. Removed all inside spoil and hauled away.
August 12, 2026
Arrived to jobsite and met with pumper truck in order to service the 2 pump pits. Began pumping the pit all the way in back flushing it as well with tons of water. Began pumping other pump pit, flushing it down as well. Found lots of debris in pits like plastic and metal. Jetted from L2 to B7 as well as televised, drains are clear. Descaled trench drains in B7 ,L2 ,and GR1. Flushed all drains in B7,L2 and GR1. Everything is working properly. Cleaned work area.