Raising Canes -Morton Grove

October 2, 2026

Arrived on site to replace tankless water heater under manufacture warranty. Turned off unit, water and gas. Disconnected service valves and supply lines. Cut out recirculating and condensation lines. Cut out section of exhaust pipe. Remove defective tankless water heater. Installed new tankless water heater and secured to wall. Installed new section of exhaust pipe with fittings and secured. Reconnect and re-piped all supplies then braced. Turned on unit and bled system. Contacted tech support to properly set up commercial tankless configuration per manufacture recommendations. Set temperature at 140°.

September 21, 2026
Residential Instalation of Bradford White Water unit. Arrived on site, disconnected and drained existing 50 gallon tank, removed and disposed of unit. Installed new Bradford White 75 gallon, re-piped gas lien with full part valve. Installed new 1" hot/ cold water lines.
September 15, 2026
Both 3" valves to tank were already shut off. Began cutting on vertical line above 3'' x 3'' x 1" tee and also cut by in between the coupling and the flange. Removed both 3 x 3 x 1 tees and the 3" 90 degree. Installed 2 3 x 3 x 1 tees with 1 x 3/4 x 1/2 bushing and connected both lines along with 2-3" coupling and a 3" 90 degree. Need to wait 24 hours to dry. Cleaned work area.
August 26, 2026
Returned to the job site to televise the roof drain from inside the building to the outside manhole. Utilized a lift to cut out the existing leaking 6" roof drain connection and multiple fittings. Removed debris and prepared the area. Re-piped the main 6" PVC and fittings, installed a cleanout, and secured the pipe vertically with support hangers and bracing. Tested the system and cleaned the work area. It's now ready for use.  Hydro jetted from the cleanout of the roof drain towards the side of the building's manhole. Flushed the fixture and conducted tests, which passed. It is ready for use.
More Posts