RPZ/Backflow Preventer Testing

March 2, 2023

Larry’s Plumbing is a certified to test your backflow preventer and also perform your annual test and certification.



Residential or Commercial RPZ Testing A Reduced Pressure Zone Device (RPZD, RPZ or RPZ valve) is a type of backflow prevention device used to protect water supplies from contamination. RPZDs may also be known as reduced pressure principle backflow prevention devices, or reduced pressure zone assemblies.


An RPZD is considered suitable for high hazard applications, that is, where the consequence of backflow into the water supply would cause significant harm. They are considered suitable because they prevent both backflow and back-siphonage, because of a redundant design (even with two check valves broken the device still provides protection), and because they are testable to verify correct operation.


RPZD are often chosen instead of an air gap since the head loss across the RPZ is much smaller.


The device consists of two independent check valves, plumbed in series, with a pressure monitored chamber between. The chamber is maintained at a pressure that is lower than the water supply pressure, but high enough to be useful downstream.


The reduced pressure is guaranteed by a differential pressure relief valve, which automatically relieves excess pressure in the chamber by discharging to a drain. Four test cocks are installed to allow an inspector to verify proper operation of the valve with a differential pressure meter. Two gate valves (one before and one after the RPZ) are provided to allow for testing and repair.


Almost all villages and towns in the Chicago area, require you to have a backflow preventer test
completed on an annual basis.


Larry’s Plumbing is certified to perform this service.

I

f your house or business needs a required yearly test, contact us at your convenience to schedule your testing.

August 26, 2026
Returned to the job site to televise the roof drain from inside the building to the outside manhole. Utilized a lift to cut out the existing leaking 6" roof drain connection and multiple fittings. Removed debris and prepared the area. Re-piped the main 6" PVC and fittings, installed a cleanout, and secured the pipe vertically with support hangers and bracing. Tested the system and cleaned the work area. It's now ready for use.  Hydro jetted from the cleanout of the roof drain towards the side of the building's manhole. Flushed the fixture and conducted tests, which passed. It is ready for use.
August 21, 2026
8/18/26 After sawcut and concreted removal, excavated down to new 6" SDR on outside and to old 4" cast iron on inside area 5' deep. Broke out old CI and tunneled under foundation. Stubbed new 6" grease line into building with wye and cleanout. Bedded in stone. Removed concrete and hauled away spoil.  8/19/26 Returned after inspection to backfill in stone over bottom of footing and haul spoil. Removed all inside spoil and hauled away.
August 12, 2026
Arrived to jobsite and met with pumper truck in order to service the 2 pump pits. Began pumping the pit all the way in back flushing it as well with tons of water. Began pumping other pump pit, flushing it down as well. Found lots of debris in pits like plastic and metal. Jetted from L2 to B7 as well as televised, drains are clear. Descaled trench drains in B7 ,L2 ,and GR1. Flushed all drains in B7,L2 and GR1. Everything is working properly. Cleaned work area.