Billy Bricks

August 21, 2026

8/18/26
After sawcut and concreted removal, excavated down to new 6" SDR on outside and to old 4" cast iron on inside area 5' deep. Broke out old CI and tunneled under foundation. Stubbed new 6" grease line into building with wye and cleanout. Bedded in stone. Removed concrete and hauled away spoil. 


8/19/26
Returned after inspection to backfill in stone over bottom of footing and haul spoil. Removed all inside spoil and hauled away. 

October 2, 2026
Arrived on site to replace tankless water heater under manufacture warranty. Turned off unit, water and gas. Disconnected service valves and supply lines. Cut out recirculating and condensation lines. Cut out section of exhaust pipe. Remove defective tankless water heater. Installed new tankless water heater and secured to wall. Installed new section of exhaust pipe with fittings and secured. Reconnect and re-piped all supplies then braced. Turned on unit and bled system. Contacted tech support to properly set up commercial tankless configuration per manufacture recommendations. Set temperature at 140°.
September 21, 2026
Residential Instalation of Bradford White Water unit. Arrived on site, disconnected and drained existing 50 gallon tank, removed and disposed of unit. Installed new Bradford White 75 gallon, re-piped gas lien with full part valve. Installed new 1" hot/ cold water lines.
September 15, 2026
Both 3" valves to tank were already shut off. Began cutting on vertical line above 3'' x 3'' x 1" tee and also cut by in between the coupling and the flange. Removed both 3 x 3 x 1 tees and the 3" 90 degree. Installed 2 3 x 3 x 1 tees with 1 x 3/4 x 1/2 bushing and connected both lines along with 2-3" coupling and a 3" 90 degree. Need to wait 24 hours to dry. Cleaned work area.