Elmwood Park IL emergency sewer repair

August 5, 2026

Arrived on site and set up. Excavated down a 6 x 6 area around the existing manhole in front of building. Dug down 5-6 feet and exposed inlet and outlet pipes. Removed spoil out. Removed walls of basin, and re-adapted inlet with outlet pipes. Installed Sdr 26 pipe, fittings, and no shear. Brought cleanout tees to grade. Backfilled in 75 percent stone and 25 percent soil. Cleaned work areas.

September 21, 2026
Residential Instalation of Bradford White Water unit. Arrived on site, disconnected and drained existing 50 gallon tank, removed and disposed of unit. Installed new Bradford White 75 gallon, re-piped gas lien with full part valve. Installed new 1" hot/ cold water lines.
September 15, 2026
Both 3" valves to tank were already shut off. Began cutting on vertical line above 3'' x 3'' x 1" tee and also cut by in between the coupling and the flange. Removed both 3 x 3 x 1 tees and the 3" 90 degree. Installed 2 3 x 3 x 1 tees with 1 x 3/4 x 1/2 bushing and connected both lines along with 2-3" coupling and a 3" 90 degree. Need to wait 24 hours to dry. Cleaned work area.
August 26, 2026
Returned to the job site to televise the roof drain from inside the building to the outside manhole. Utilized a lift to cut out the existing leaking 6" roof drain connection and multiple fittings. Removed debris and prepared the area. Re-piped the main 6" PVC and fittings, installed a cleanout, and secured the pipe vertically with support hangers and bracing. Tested the system and cleaned the work area. It's now ready for use.  Hydro jetted from the cleanout of the roof drain towards the side of the building's manhole. Flushed the fixture and conducted tests, which passed. It is ready for use.