Both 3" valves to tank were already shut off. Began cutting on vertical line above 3'' x 3'' x 1" tee and also cut by in between the coupling and the flange. Removed both 3 x 3 x 1 tees and the 3" 90 degree. Installed 2 3 x 3 x 1 tees with 1 x 3/4 x 1/2 bushing and connected both lines along with 2-3" coupling and a 3" 90 degree. Need to wait 24 hours to dry. Cleaned work area.
Condo Association Parking lot sewer repair. Rebuild storm sewer. Remove 4 parking blocks, saw cut approximately 8 X 8 around storm basin. Breakout asphalt and concrete, and haul away spoil. Install new spacer rings and bricks where needed. Seal inside and outside of basin, install new storm sewer lid and cover. Backfill 100 % stone and compact. Additional work was required. Once excavation started found we had to replace the whole manhole structure wall and some piping 8 inches.
Upon arrival met with Village water works, isolated main to complex. Disassembled water meter, removed flange. Cut out old valve and removed nipple from 4 x 3 bushing. Installed new valve and had village pressurize main. From there installed new 90 and re-tightened flange. Installed water meter fully tightened and pressurized building main. Tested for leaks and flow passed. Cleaned work area.
Arrived on site to replace tankless water heater under manufacture warranty. Turned off unit, water and gas. Disconnected service valves and supply lines. Cut out recirculating and condensation lines. Cut out section of exhaust pipe. Remove defective tankless water heater. Installed new tankless water heater and secured to wall. Installed new section of exhaust pipe with fittings and secured. Reconnect and re-piped all supplies then braced. Turned on unit and bled system. Contacted tech support to properly set up commercial tankless configuration per manufacture recommendations. Set temperature at 140°.